Overview:
Blue Science Engineering successfully implemented a 1.2MW hybrid solar and battery energy system for a leading manufacturing plant in Dhaka. The system ensures consistent power supply, integrates grid synchronization, and reduces dependency on fossil fuels by 65%.

Key Deliverables:

  • Solar panel installation (rooftop + ground-mounted)

  • Intelligent inverter and battery storage integration

  • SCADA-based energy monitoring and control

  • Power optimization for peak-hour load balancing

Results:

  • 65% reduction in fuel consumption

  • 40% lower electricity costs

  • Annual COâ‚‚ emission reduction: 1,400 tons

Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare